|
Rebuilding begins. We worked some more on the floor and put the first block in so that we could make sure everything would be level. Rebuilding of the recuperating tubes also started today, and we tore down the front of the 1st tunnel. |
![]() Furnace Box Ready To Go Up |
![]() Rebuilding Recuperating Tubes |
![]() Recuperating Blocks In Basement |
![]() Pots Broken For Chunk |
![]() Chunk Glass Out Of Pot |
![]() Breaking Pots For Chunk |
![]() Breaking Pots For Chunk |
![]() Breaking Pots For Chunk |
![]() Pulling Chunk Out |
![]() Glass Broken Into Chunks |
![]() Furnace Floor |
![]() Furnace Floor |
![]() Putting Block In |
![]() First Block In Floor |
![]() Recuperating Tube Rebuild |
![]() Front Of Recuperating Tunnel |
|
|
|
|
|
|
|
|
|
|
|
|
| Home | Samples | Tour | Gallery | Gear | History | Contact | Links | FAQ | Specs | Studio |
Wallpaper on this page is part number 14SPL.
Copyright© 1995-2000 Kokomo Opalescent Glass. All rights reserved.
Page designed and updated by Dan Waber, dan@kog.com