Furnace Rebuild 2004--Day 31

We put the insulating brick on the crown (this brick was laid horizontally). We also began repair on the furnace mouth and put the covers back on the recuperating tunnels. Corner brick work had stopped because we had to wait for the furnace to come up to temp. While the furnace temp came up we had to adjust the steel bands and if the brick work was done we wouldn't have been able to get to the bolts to adjust it.


Laying Insulating Brick

Insulating Brick

1 Section Insulating Brick

Insulating Brick Half Done

Insulating Brick On

Insulating Brick Done

Inside The Eye

Front Tunnel 2 Complete

Repairing The Mouth

Back Of Tunnel Complete

Mouth Of Furnace Repair

Back to Day Thirty     |     Proceed to Day Thirty-two



Take me back to the Main Page Show me the samples Take me on the tour Take me to the Gallery Gimme the gear Tell me some history Get ahold of us Other cool sites Hey, I gotta question Hot, hot, oooh, so hot.
Home Samples Tour Gallery Gear History Contact Links FAQ Specs Studio

Wallpaper on this page is part number 14SPL.
Copyright© 1995-2000 Kokomo Opalescent Glass. All rights reserved.
Page designed and updated by Dan Waber, dan@kog.com